8 signs your software project needs a rescue
A software project needs a rescue when the same problems last for months: deadlines keep moving and releases break things. Other signs: only one person knows how it works, the framework is out of support, and you do not control your accounts. Two or more signs for a couple of months mean it is time for outside help.
Updated
Written by Jesse Sanders, CEO & Enterprise Principal
The eight signs
A software project needs a rescue when the same problems last for months: deadlines keep moving, releases break things, and nobody can say what the work will cost. One bad sprint is normal, but two or more of these signs for more than a couple of months mean the team is unlikely to fix it from the inside without help.
One of these on its own can be normal. Two or more, for more than a couple of months, mean the project needs attention.
| Signs you see | What it means | What to do |
|---|---|---|
| None or one | Probably a normal rough patch. | Fix the one problem directly, and check again in a month. |
| Two or three | The project needs attention now. | Get an outside view of the code and the process before the problems compound. |
| Four or more | The project is in trouble. | Protect your accounts first, then get an independent review before you spend more on the current plan. |
Deadlines keep moving
Each estimate is missed, and so is each new date. Nobody on the team can say with confidence when the next feature will ship.
What it usually means: Work is not broken into pieces small enough to estimate, hidden dependencies surface late, or scope is added without anything being taken out.
Every release breaks something
A fix in one place causes a defect somewhere else. Releases need a long manual check, or they get rolled back.
What it usually means: Parts of the code depend on each other in ways nobody can see, there are few automated tests, or the release steps are manual and differ from one release to the next.
Nobody trusts the tests
The automated tests fail often, are skipped, or do not exist. Every change is a risk, and your users find the defects first.
What it usually means: The tests were written late or not maintained, they depend on shared data or timing, and the team has learned to ignore red builds.
The budget grows, the product does not
Spending keeps rising, but the list of finished features stays about the same from month to month.
What it usually means: Most of the team's time goes to fixing defects, waiting on environments or redoing work, rather than to new features.
Only one person knows how it works
One developer or one vendor holds the knowledge, the logins or the deployment steps. If they leave, the project stops.
What it usually means: Nothing is documented, the deployment runs from one laptop or one account, and nobody else has been given the time to learn the system.
The framework is out of support
The application runs on a framework or runtime version that no longer gets security fixes, and the upgrade keeps being put off.
What it usually means: Each upgrade was skipped because it looked risky, so the gap grew until the upgrade became a project of its own.
You cannot get straight answers
Status reports are vague, demos get cancelled, and questions about the code or the costs get no clear reply.
What it usually means: The team or the vendor does not know the answer either, or is not comfortable telling you. Either way, you cannot plan on what you are told.
You do not control your own accounts
The code repository, the hosting, the domain or the app-store accounts belong to the vendor, not to your company.
What it usually means: The accounts were opened by whoever built the product, for convenience, and nobody moved them to the company later.
A five-minute self-check
Answer each question yes or no, for the last three months. Be strict: "sort of" counts as yes.
- Has the current delivery date moved more than once?
- Did the last three releases each need a hotfix or a rollback?
- Are automated tests skipped, failing, or missing for the features that earn money?
- Has spending gone up while the number of finished features stayed flat?
- Would the project stop if one named person left tomorrow?
- Is the framework or runtime past its end-of-support date?
- Have status questions gone unanswered, or been answered vaguely, for weeks?
- Is any account the product runs on owned by someone outside your company?
Reading your answers
- No or one yes
- Probably a normal rough patch. Fix the one problem directly, and check again in a month.
- Two or three yeses
- The project needs attention now. Get an outside view of the code and the process before the problems compound.
- Four or more yeses
- The project is in trouble. Protect your accounts first, then get an independent review before you spend more on the current plan.
What is not a sign
Some problems look like the signs above and are part of normal software work. Telling them apart saves you from replacing a team that is doing fine.
One slow sprint after a big release
Teams often slow down while they fix what a large release shook loose. Watch the next two or three sprints before you worry.
One defect your users found
Every product ships defects. The sign is a pattern: the same kind of defect again, or defects that each release brings back.
A developer leaving with a proper handover
People move on. If the code, the accounts and the deployment steps were handed over in writing, that is a normal change, not a crisis.
An honest estimate that got bigger
An estimate that grows because the team learned something, and says so early, is the process working. Silence until the deadline is the sign.
What a rescue involves
A rescue is not a new team that starts over. It usually runs in three phases, whoever does it. See how Briebug runs a software project rescue.
- Assess. Review the code, the architecture, the process, the release pipeline and the security, and decide what to fix first. This takes days, not months.
- Stabilize. Fix what blocks everything else: the release pipeline, the tests, security gaps and the defects users see. Delivery becomes predictable again before new features resume.
- Hand it back. Document what changed and why, and pair with your team until they can run the system without outside help.
If a firm cannot describe how its work ends, ask before you sign. The goal of a rescue is a project your own team can run.
What to do first
- Protect what you have. Make sure a person at your company owns or administers every account: the code, the hosting, the domain and the app stores. If your developer has stopped answering, start with these six steps.
- Get the facts before you spend more. An independent technical assessment reviews the code, the process, the pipeline and the security, and says what to fix first.
- Then decide. With the assessment in hand, you can choose between fixing the project and replacing parts of it. See how to decide between rescue and rebuild.
For the full recovery plan, step by step, see how to stabilize an over-budget software project.
If the framework that is out of support is AngularJS, see AngularJS to Angular migration services.
What to have ready before you call a rescue firm
You do not need all of this to start, but each item saves time in the first week, whoever you hire.
- A one-page description of what the product does and who uses it
- The stack: languages, frameworks and versions, and where it is hosted
- Which of the eight signs you see, with one recent example of each
- Any date you must meet, and what happens if you miss it
- A list of the accounts the product runs on, and who owns each
- Contracts and statements of work with the current team or vendor
Then compare firms against the same criteria: how to choose a software project rescue firm.
Common questions
When should we bring in outside help?
When two or more of these signs last for more than a couple of months, or when one of them puts a contract date or your users' data at risk.
Can a project be rescued without replacing our current team?
Yes. A rescue can work alongside your engineers. Briebug pairs with in-house teams and hands the project back to them, with documentation of what changed and why.
Should we rescue the project or rebuild it?
That depends on what an independent review of the code finds. Many projects can be fixed without starting over, and a rebuild has costs that are easy to miss.
How much does a technical assessment cost?
A fixed fee of $10K, and about 1 week. You get a comprehensive report you can take to anyone, a triage report of what to fix in what order, and a milestone-based estimate.
How do we choose a firm to rescue the project?
Look for a fixed-fee review before the big commitment, senior engineers, current security certifications, a written plan for handing the project back, and case studies like your project.
See two or more of these signs?
Book a short call with a senior engineer. We will scope the assessment and confirm the fixed fee before you commit.